Factors Affecting Slow Progress of Construction Projects With State Budget Capital in Binh Son District, Quang Ngai Province

Main Article Content

Nguyen Quang Anh1,*, , Tran Ha Trieu Binh1
1 University of Economics Ho Chi Minh City

Abstract

The main research objective of the thesis is to study the factors affecting the completion progress of construction projects funded by the state budget in Binh Son District. On that basis, we propose recommendations to improve the delay in completing
civil construction projects in Binh Son District. The specific objectives of the study are: (1) to determine the factors affecting the progress of construction projects with state budget capital; and (2) to determine the degree of influence of factors on the progress of construction projects funded by the state budget in Binh Son District. The thesis has synthesized the theoretical basis of the investment project and the progress of completing the construction investment project, inherited the previous research works, and proposed a research model for the influence of factors affecting the progress of construction projects. The research model is designed with 39 observed variables belonging to 7 independent variables of factors. The results of the reliability test and the EFA factor analysis confirmed that the observed variables were suitable for the study. The results of the regression model show that there are four factors that affect the delay in project implementation, including: stability of the external environment, policy, decentralization of management, and capacity of stakeholders participating in the project.

Downloads

Download data is not yet available.

Article Details

How to Cite
Nguyen, Q. A., & Tran, H. T. B. (2024). Factors Affecting Slow Progress of Construction Projects With State Budget Capital in Binh Son District, Quang Ngai Province. The University of Phan Thiet Journal of Science, 2(3), 18-35. https://tapchikhoahocupt.vn/index.php/uptjs/article/view/18
Section
Articles

References

Abraham. L.G. (2002). Indetification of critical Factors for construction organizations the architectural/engineering/construction (A/E/C) industry. Thesis, Ph.D, Georgia Tnstitute of Technology.

Alnuaimi, A. S., & Mohsin, M. (2013, December). Causes of delay in completion of construction projects in Oman. In International Conference on Innovations in Engineering and Technology (pp. 267-270).

Baloi, D., & Price, A. D. (2001). Evaluation of global risk factors affecting cost performance in Mozambique. In COBRA Conference.

Báo Đầu tư. (2023). Số ra ngày 20/01/2023. Truy cập từ: https://baodautu.vn/

Belassi, W. & Tukel, O.I. (1996). A new framework for determining critical success/ failure factors in project. International Journal of Project Management, 14(3), 141-151.

Bộ Kế hoạch & Đầu tư. (2008). Báo cáo tình hình thực hiện chính sách pháp luật về đầu tư XDCB sử dụng vốn nhà nước ở các Bộ, ngành, địa phương từ 2005-2007 (số 7898/BCBKH, ngày 29/10/2008).

Bộ Kế hoạch và Đầu tư. (2023). Tổng hợp báo cáo giám sát, đánh giá tổng thể đầu tư năm 2022. Truy cập tại địa chỉ: https://giamsatdautuquocgia.mpi.gov.vn/Pages/tinbai.aspx?idTin=351

Bùi Sĩ Hiển. (2005. Pháp luật đầu tư xây dựng ở nước ta: Thực trạng và giải pháp. Tạp chí Nghiên cứu Lập pháp, 10, trang 1-7.

Chan, A.P.C (2001). Framework for Measuring Success of Construction Projects. School of Construction Management and Property, Queensland University of Technology, Brisbane, Australia.

Chính phủ. (2009). Nghị định về quản lý chi phí đầu tư xây dựng công trình (số 99/2007/NĐ-CP ngày 13/6/2007, số 03/2008/NĐ-CP ngày 07/01/2008, số 112/2009/NĐ-CP ngày 14/12/2009).

Chính phủ. (2015). Hướng dẫn thi hành một số điều của Luật Đầu tư công, Nghị định số 136/2015/NĐ-CP (ngày 31/12/2015).

Chính phủ. (2015). Quản lý dự án đầu tư xây dựng công trình, Nghị định số 59/2015/NĐ-CP (ngày 18/06/2015).

Cổng Thông tin Chính phủ. (2023). Truy cập ngày 15/1/2023 tại địa chỉ: https://chinhphu.vn/

Divakar, K., & Subramanian, K. (2009). Critical success factors in the real-time monitoring of construction projects. Research Journal of Applied Sciences, Engineering and Technology, 1(2), 35-39.

Dương Văn Cận. (2009). Những cản trở Nghị định 99/CP khó đi vào cuộc sống cần nghiên cứu khắc phục. Tạp chí Kinh tế Xây dựng, 2, trang 3-5.

Faniran, O. O., Oluwoye, J. O., & Lenard, D. J. (1998). Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), 245-256.

Hoàng Trọng Quyết. (2020). Thực trạng và giải pháp nâng cao hiệu quả quản lý dự án đầu tư công tại Việt Nam. Tạp chí Khoa học và Công nghệ Việt Nam.

Kiểm toán nhà nước. (2023). Báo cáo kiểm toán năm 2022 - Khu vực miền Trung và Tây Nguyên. Truy cập tại địa chỉ: https://hoatdongkiemtoan.sav.gov.vn/Pages/ket-qua-kiemtoan.aspx

Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12, 367-377.

Liêu Hữu Hùng. (2016). Phân tích các nhân tố ảnh hưởng đến chậm chậm tiến độ thực hiện dự án xây dựng trên địa bàn tỉnh Long An. Luận văn Thạc sĩ Kinh tế, Trường Đại học Kinh tế TP.HCM.

Lim, C. S., & Mohamed, M. Z. (1999). Criteria of project success: an exploratory reexamination. International journal of project management, 17(4), 243-248.

Luu, M. H. (2009). Factors affecting risks of construction projects in Vietnam. Maastricht School of Management, Maastricht, The Netherlands.

Nguyen, Q. T., Le, T. H. A., & Nguyen, B. N. (2014, November). Time delays causes in construction projects in Hanoi, Vietnam: Contractors’ perspectives. In Proceedings of the International Symposium on New Technologies for Urban Safety of Mega Cities in Asia, Yangon, Myanmar (pp. 3-5).

Oshakbayev D.Zh., et al. (2020). Problems of delays in the implementation of investment projects. Bulletin of the Karaganda University Economy Series.

Owolabi James, D., Amusan Lekan, M., Oloke, C. O., Olusanya, O., Tunji-Olayeni, P., & Owolabi Dele, P. (2014). Causes and effect of delay on project construction delivery time. International Journal of Education and Research, 2(4), 197-208.

Pinto, J. K., & Prescott, J. E. (1988). Variations in critical success factors over the stages in the project life cycle. Journal of Management, 14(1), 5-18.

Standard, B. (2000). Project management Part 3: Guide to the management of business related project risk. British Standards Institution.

Tăng Thị Đẹp. (2017). Phân tích các yếu tố ảnh hưởng đến chậm tiến độ dự án đầu tư xây dựng thuộc vốn ngân sách trên địa bàn tỉnh Trà Vinh. Luận văn Thạc sĩ Kinh tế, Trường Đại học Kinh tế TP.HCM.

Thi, C. H. (2006). Critical success factors in project management: An analysis of infrastructure projects in Viet Nam. Asean Institute of Technology, School of Management, Bangkok, Thai Lan.

Thi, C. H., & Swierczek, F. W. (2010). Critical success factors in project management: implication from Vietnam. Asia Pacific Business Review, 16(4), 567-589.

Trang thông tin điện tử huyện Bình Sơn. (2023). Truy cập tại địa chỉ: https://binhson.quangngai.gov.vn/

Trịnh Thùy Anh và Nguyễn Thị Thanh Thảo. (2011). Các yếu tố ảnh hưởng đến thời gian thực hiện dự án công trình giao thông tại TP.HCM và các vùng lân cận. Tạp chí Phát triển Kinh tế, 246, trang 50-55.

UBND huyện Bình Sơn. (2022). Báo cáo tổng kết đầu tư xây dựng cơ bản giai đoạn 2016-2021 của UBND huyện Bình Sơn. Truy cập từ: https://binhson.quangngai.gov.vn/

Van, L. T., Sang, N. M., & Viet, N. T. (2015). A conceptual model of delay factors affecting government construction projects. ARPN Journal of Science and Technology, 5(2), 92-100.

Vũ Thành Tự Anh, Lê Viết Thái, & Võ Tất Thắng. (2007). Xé rào ưu đãi đầu tư của các tỉnh trong bối cảnh mở rộng phân cấp ở Việt Nam: “sáng kiến” hay “lợi bất cập hại”.

Chương trình Phát triển Liên Hiệp Quốc tại Việt Nam, truy cập tại địa chỉ: http://www.fetp.edu.vn/index.cfm.